The objective was to cut rock during excavation so that it could be recovered in blocks.
A line of holes 32 mm in diameter and 6 m deep was drilled at 25 cm intervals along the boundary of the excavation area.
Expansive mortar was applied to fill the holes completely.
The work used a two-person crew, a drill mast mounted on a compact excavator, and a compressor.
The resulting cut made it possible to cut granite blocks for use as dimension stone.