Originally published · 2020-04-26

Location · Guimarães, Braga

The objective was to cut rock during excavation so that it could be recovered in blocks.

A line of holes 32 mm in diameter and 6 m deep was drilled at 25 cm intervals along the boundary of the excavation area.

Expansive mortar was applied to fill the holes completely.

The work used a two-person crew, a drill mast mounted on a compact excavator, and a compressor.

The resulting cut made it possible to cut granite blocks for use as dimension stone.