Originally published · 2018-11-09

Location · Sintra, Lisboa

The objective was to lower the site level by about 50 cm.

The rock was a mass of slightly weathered yellow granite.

Expansive mortar was applied to break up the entire rock mass using a staggered pattern of holes spaced 20 cm apart.

The following photographs show the results of the work with expansive mortar.